Digital deliverables. Ready when needed.

Models, drawings and asset information need to be ready when the programme calls for them. We plan, coordinate and manage that information through project delivery.

Support through the delivery lifecycle.

Our support follows six connected stages. Start where your project needs us, from agreeing requirements to preparing information for handover.

Assess project requirements

Agree what information the project needs, who is responsible for it and where delivery is at risk.

  • Information requirements
  • Responsibilities and capability
  • Delivery risk review

Develop digital delivery strategy

Plan when each digital deliverable is needed, who produces it and how it will be reviewed against project requirements.

  • ISO 19650 Information Management
  • Delivery structure and responsibilities
  • Programme integration

Set up project controls and platforms

Connect drawing and model registers to delivery milestones, with visibility of outstanding reviews and the information holding work up.

  • Drawing and model registers
  • Source-driven reporting
  • Blocker visibility

M&E Digital Engineering

Coordinate M&E design through RIBA Stages 3 to 5 so it can be built, installed and maintained. We run clash detection, develop DfMA and modular proposals, check buildability and the access installers and maintenance teams need, and review design risk under the Construction (Design and Management) Regulations 2015 (CDM). We then manage the models and drawings through change, keeping fabrication and installation requirements in view.

  • Clash detection and coordination
  • Developing DfMA and modular proposals
  • M&E coordination management
  • Buildability review
  • Installation and maintenance access
  • CDM design risk review
  • Programme management
  • Design change management

Model coordination partners.

We work with a select group of M&E model coordination partners. Their detailed 3D models make the digital asset fit for construction.

Asset data management

Set up asset records and check their completeness as the works progress. Track missing information while there is time to resolve it.

  • Asset information requirements
  • Data validation
  • Handover readiness

Digital asset handover

Bring checked records together for handover in formats the receiving team can use and maintain.

  • As-built delivery
  • Verified asset information
  • Open process handover

Get the information your next milestone needs.

Tell us what needs to be issued, coordinated or checked, and when the project needs it.